Skip to content

ALTCER

Field demo

See the measurement on your own asset

A demo is a measurement, not a presentation. It starts with a feasibility check, so nobody travels to a structure that falls outside the validated envelope.

How a demo runs

  1. Asset brief Material, geometry, coating and access.
  2. Feasibility Whether the measurement is inside the validated envelope. A no arrives here, not on site.
  3. Targets Which points will be measured and what would count as a result.
  4. Demo The measurement flight on your asset.
  5. Data review Readings, signal quality and rejected points reviewed together.
  6. Deployment discussion Buy, rent or have the inspection performed.

Request a field demo


An engineer answers with a feasibility view first. If your asset is outside the validated envelope you will be told before any visit is arranged.